Case Study
Real problems from Bangladeshi plants: how we understood the requirement, found the root cause, selected the solution and measured the result. Learn from them before the same failure reaches your line.
From breakdown to lasting fix
Observe
Site visit, failure history, photographs and operating data from the machine.
Analyse
Failure-mode review and root cause analysis to separate the symptom from the cause.
Act
The correct part, correct installation and corrected maintenance practice.
Verify
Track running hours, vibration or failures after the fix and record the result.
Which challenge are you facing?
Our case studies are grouped by the type of problem, so you can quickly find one close to your own situation.
The same part keeps failing
Investigations where replacing the part was not enough, and finding the real cause stopped the cycle.
Production has stopped
Fast fault finding and urgent sourcing to get a critical machine running again.
The original part is unavailable
Specification matching, alternative brands and upgrades for obsolete or long-lead components.
We want fewer stoppages
Moving equipment from breakdown maintenance to planned, reliability-based practice.
Real problems. Real root causes. Measured results.
Each case is written in four parts (problem, root cause, solution and result) so you can compare them and apply the lessons in your own plant.
01 Cement · High vibration on an induced-draft fan
- Problem: high vibration on a critical induced-draft fan, raising the risk of an unplanned kiln stoppage.
- Root cause: confirmed by vibration measurement; the usual causes are imbalance from material build-up on the impeller, soft foot or bearing looseness.
- Solution: correction matched to the confirmed cause: impeller cleaning and field balancing, soft-foot correction or bearing replacement with correct fits.
- Result: vibration measured before and after the correction and compared with the plant’s vibration limits.
Lesson: measure before you replace. Vibration readings point to the cause.
02 FMCG · Frequent cylinder and valve failure on a packing line
- Problem: frequent pneumatic cylinder and valve failures causing repeated packing-line stoppages.
- Root cause: traced to compressed-air quality and component specification: wet, unfiltered air or a valve not matched to the duty.
- Solution: air treatment restored (drains, filters and dryer checked) and valves re-specified for the duty cycle.
- Result: failures per month tracked before and after the change.
Lesson: pneumatic component life depends on air quality as much as on the component.
03 Power · Short mechanical seal life on a cooling-water pump
- Problem: short mechanical seal life and leakage on a cooling-water pump.
- Root cause: investigated against the usual causes: dry running, shaft misalignment or a seal type not suited to the water quality.
- Solution: alignment corrected, operating conditions checked and the seal re-specified for the duty.
- Result: seal life recorded before and after the change.
Lesson: a mechanical seal usually fails because of how the pump runs, not because of the seal.
04 Steel · Alternative supplier for a horizontal articulated spindle
- Problem: the OEM horizontal articulated spindle for stand 350 cost TK 800,000 with a 12-month lead time.
- Root cause: single-source dependency on the OEM for a critical spare.
- Solution: matched the full specification and drawings and qualified an alternative supplier. The same approach was used for shear plain blades.
- Result: spindle at TK 201,020 with a 5-month lead time (about 75 % lower cost). Shear blade TK 19,442 instead of TK 32,650, with a 4-month instead of 6-month lead time.
Lesson: with complete drawings and specifications, a qualified alternative can match the OEM part at a fraction of the cost and lead time.
05 Steel · Looper redesign raises MTBF from 4 to 36 months
- Problem: a cantilever vertical looper working about 1,500 cycles a day had short bearing and roller life, broken roller mounting bolts and worn moving shafts and bushes.
- Root cause: the cantilever design concentrated the cyclic load on the roller bearings, mounting bolts and bushes. Better spare parts could not fix a design limitation.
- Solution: modified the looper design and fabricated eight loopers in-house instead of importing them.
- Result: MTBF increased from 4 months to 36 months, spare life increased and looper delay fell. In-house fabrication cost TK 3,256,000 against TK 15,800,000 for imported units, a saving of TK 12,544,000.
Lesson: when a part fails because of the design, a better part will not fix it. Modify the design.
06 Steel · Pneumatic cylinder delays traced to the air dryer (5-Why)
- Problem: pneumatic cylinder up/down downtime above the plant standard.
- 5-Why: (1) Why is downtime high? Solenoid valve spools jam. (2) Why do they jam? Particles in the valve. (3) Why particles? Rust inside the carbon-steel air supply pipe. (4) Why rust? Water coming from the dryer. (5) Why water? Wrong dryer type and capacity.
- Root cause: valve malfunction caused by particles from a wet, rusting air supply, starting at an undersized dryer.
- Solution: corrective: replaced the jammed solenoid valves. Preventive: installed a new filtration system and increased the FRL check frequency in the preventive maintenance plan.
- Result: reduced delay time and spare valve consumption.
Lesson: replacing the valve treats the symptom. Fix the air quality at its source.
07 Steel · Repeated bearing failure on a mill-stand gearbox
- Problem: gearbox bearings failing repeatedly, causing unplanned mill stoppage.
- Root cause: investigated across bearing clearance class, lubrication condition and shaft alignment.
- Solution: bearing specification, installation method and lubrication practice corrected to match the duty.
- Result: running hours and downtime compared before and after the correction.
Lesson: when the same bearing fails repeatedly, investigate the conditions around it before ordering the next one.
08 Steel · Rolling mill vertical stand drifting down during rolling
- Problem: the vertical stand slowly lowered from its set position during rolling, moving the stand off the pass line and stopping the mill.
- Root cause: internal leakage in the hydraulic counterbalance (load-holding) circuit. A worn counterbalance valve seat and seals let the cylinder creep down under load.
- Solution: isolated and pressure-hold tested the cylinder and the valve separately to find the leaking component; replaced the counterbalance valve cartridge and seals and set it to the manufacturer’s pressure; flushed and filtered the oil; added a monthly hold (drift) test to the preventive maintenance plan.
- Result: the stand holds its set position under rolling load; drift and stoppages are recorded before and after the repair.
Lesson: a load that creeps down is almost always internal leakage. Test the cylinder and the valve separately before replacing either.
09 Steel · Spindle holder bearing damage on a rolling mill stand
- Problem: spindle holder bearings failing, causing unplanned mill stoppage.
- Root cause: fishbone analysis traced the failures to a blocked air-oil lubrication distributor block. Contamination in the distributor starved the bearings of oil.
- Solution: corrective: replaced the damaged roller and the distributor. Preventive: fitted a new filter to every air-oil distributor, updated the preventive maintenance plan for the air-oil system, moved stand 1 to 18 bearings from grease to air-oil lubrication and started condition-based monitoring.
- Result: lower overall mill delay and lower bearing and spare consumption, with bearing life tracked after the change.
Lesson: bearing life depends on lubricant actually reaching the bearing. Check the flow at each distributor, not only that the lubrication pump is running.
More project reports are being prepared
We publish a case only when the result has been measured over a meaningful period. For information relevant to your application, contact our team with your industry and equipment details.
Have a similar requirement?
Explore our industry pages to identify relevant product categories, or discuss your technical challenge directly with our engineers.
What every case study records
The operating challenge
Equipment, application, operating conditions and the specific issue to be solved.
The technical review
Part identification, drawings, measurements and the constraints that informed the approach.
The selected approach
Product selection, sourcing scope and implementation details, supported by documentation.
The measured outcome
Recorded observations and results, including the measurement period and any limitations.
What 20 years of breakdowns teach
The failed part is evidence
Keep it and photograph it before cleaning. It often tells you more than the part number.
Specification errors repeat
A missing suffix or wrong rating will fail again in exactly the same way.
Lubrication and alignment first
Many “poor quality part” complaints trace back to installation and lubrication practice.
Measure before and after
Without running hours or vibration readings, you cannot prove a fix worked.
Facing a similar problem? Let’s solve it together.
Share these details so our engineers can understand your requirement quickly:
Application brief checklist
- Machine name, manufacturer and model.
- Symptoms or replacement need: what happens, how often and since when.
- Operating conditions: speed, load, temperature and environment.
- Photographs of the failed part, the nameplate and the installation, plus drawings if available.
- Measurements and maintenance records, such as running hours, vibration or temperature readings.
Your problem could become the next lasting fix. We will always ask before publishing any project as a case study.